Expand your knowledge
Experience our solutions for your specific application, process, or laboratory tasks.
Success Stories
Reducing Fitration Time and Recovering Dead Volumes

BUSINESS CHALLENGES
- Dead Volume: 5 to 10 % of product loss per batch in formulation and filling area.
- Drainage Limitations: the filtration process configuration made line drainage impossible.
- Filtration Time: Average filtration cycle exceeded 2 hours on average per batch, limiting throughput volume.
SOLUTION
- Filter Sizing and Process Optimization
We performed filter sizing study to decrease the throughput filtration time without compromise on quality. - Downstream Vent Filtration
We applied a vent filter downstream, enabling complete drainage of filling line and recovery of 98% of dead volume. - Filter Media Selection and Validation
Our lab scale trials identified the optimal Capsule with PES filter media and pore size, improving filtrate quality.
RESULT AND BENEFITS
- 50 % decrease in filtration time
- 98 % dead volume recovered
- Improved filtrate quality
- Faster and efficient batch
Download Success Story - Reducing Fitration Time and Recovering Dead Volumes
Flexible Single Use Systems, Shorter Lead Times

BUSINESS CHALLENGES
- Slow Delivery: The existing supplier’s lead times were creating recurring bottlenecks.
- High MOQ: Rigid MOQ requirements forced excess stock holding tying up capital, creating financial impact.
- Limited Flexibility: Existing SUS setup made it difficult to adapt to changing process requirements.
SOLUTION
- SUS Process Review:
We conducted a full review of client’s Single Use process to identify and eliminate the pain points. - Configuration Optimisation:
We redesigned SUS configuration to guarantee high-quality yield with significantly reduced delivery times. - Flexible, User-Friendly Design:
The SUS were tailored to meet the process requirements of client increasing flexibility and adaptability, with no MOQ constraints adding to cost being saved.
RESULT AND BENEFITS
- Shorter delivery and operating lead times of 6 to 8 weeks
- Simplified user-friendly process
- Reduced cost of excess stock, increasing financial savings of 25% per annum
- Increased flexibility to adapt to change
Download Success Story - Flexible Single Use Systems, Shorter Lead Times
